Newly Designated as a GHG Target Management Company? — The Oct 23, 2026 Additional Designation Notice for the Industrial Sector, from the 30-Day Objection Window to Emissions Statements, Implementation Plans and Third-Party Verification: A First-Year Guide for Korean SME and Mid-Sized Manufacturers

Korea's trade ministry designated additional industrial GHG target management companies on October 23, 2026. This guide walks first-time SME and mid-sized manufacturers through the 30-day objection window, verified emissions statements, implementation plans and related support programs.

KITIM Consulting Team

What the October 23 Notice Says

On October 23, 2026, Korea's Ministry of Trade, Industry and Resources issued its "2026 Additional Designation of GHG Target Management Companies in the Industrial Sector." The Industrial Energy Cooperation Division handles it. The legal basis is Article 27 of the Framework Act on Carbon Neutrality and Green Growth, Article 20 of its Enforcement Decree, and Article 20 of the target management guidelines (Ministry of Environment Notice No. 2025-165).

Two related notices came out the same month. A correction notice on October 6 reflected re-review results, and an October 28 notice withdrew part of that correction. So your first step is to check the attached list: were you newly added, corrected, or withdrawn?

Target management is also a different system from the Emissions Trading Scheme. ETS companies (772 in the 4th allocation period) receive and trade allowances. Target management companies trade nothing. Instead, they agree a reduction target with the government and then deliver on it.

Why You Were Designated

Designation depends on your average annual GHG emissions over the past three years. The long-standing thresholds are 50,000 tCO2eq per company or 15,000 tCO2eq per site, and crossing either one is enough. Check the notice and guidelines to confirm whether energy-use thresholds also apply and whether any figures have changed.

Common first-time triggers include:

  • A plant expansion or higher utilization that pushed the three-year average over the line
  • A merger or new site that raised company-wide emissions
  • A single site crossing 15,000 tonnes, which raises questions about the designation unit and what the emissions statement must cover
  • The First 30 Days: Decide Whether to Object

    If you disagree with the designation, you can file a written objection with the competent sector agency within 30 days of the notice. For an October 23 notice, that means late November (around November 22). Confirm the exact deadline against the original notice.

    Grounds worth examining:

  • Emissions from sites you have already sold or closed were included
  • Emission factors or unit conversions were wrong and inflated the total
  • Fuel or electricity use was counted twice
  • Organize energy bills, equipment operating logs and site transfer or closure records by month. Once the window closes, the designation is very hard to challenge.

    Your First-Year Compliance Calendar

    | Step | Timing | What's due |

    |------|--------|------------|

    | Emissions statement | End of March each year | Statement verified by a third party |

    | Target setting | When the agency notifies you | Target based on your baseline emissions |

    | Implementation plan | Year-end (December) | Reduction plan for the following year |

    | Performance report | March of the next year | Results against the target |

    The emissions statement must be verified before you submit it. Verifier demand peaks ahead of the March deadline, so start selecting and contracting a verifier now, not in January. Failing to submit, or submitting false data, can lead to improvement orders and fines under Article 83 of the Act (up to KRW 10 million). Confirm the exact amounts in the Enforcement Decree schedule.

    Five Common Sticking Points

  • No monthly source data: you can't document each site's fuel, power and steam use month by month
  • Process emissions: you have to choose a calculation tier for emissions from calcination or chemical reactions
  • A one-person team: data sits across accounting, facilities and general affairs, and one person has to collect it
  • First-year errors stick: mistakes in your first statement become the basis for future targets
  • Mismatched numbers: if your statement differs from Scope 1 and 2 data you already gave customers, your credibility suffers
  • Turning Compliance Into Opportunity

    You may be able to link compliance work to support programs such as the Korea Energy Agency's GHG inventory support, GHG reduction equipment subsidies and SME carbon-neutral investment programs. Eligibility for designated companies varies by program, so check each year's call for applications. Verified emissions data can also feed green and transition finance reviews, customer supply-chain questionnaires, and CBAM and product carbon footprint (PCF) calculations.

    Action Checklist

  • Find your company and sites on the attached list, and decide on an objection before late November
  • Gather three years of energy and emissions source data for each site
  • Compare verifiers, set a contracting timeline, and appoint an internal owner
  • KITIM supports newly designated companies through the whole first year: reviewing whether the designation is correct, preparing objections, drafting emissions statements, handling verification, and linking you to reduction-equipment programs. The objection window is closing soon, so contact KITIM today for a consultation.

    GHG Target Management SchemeTarget Management Company DesignationMOTIR NoticeGHG Emissions StatementImplementation PlanThird-Party VerificationCarbon Neutrality Framework ActKorean SME Manufacturers

    Related Posts

    Bio

    Biologics Approval Fees Rise From KRW 8.03M to 20.71M, Data-Submission Drugs About 6x — MFDS Fee Regulation Amendment Pre-Announced Nov 6, 2026 (Comments Due Nov 26 / Dec 16): Filing Timing, Budget Review and Fee-Reduction Checks for Pharma & Bio SMEs

    Under the fee amendment MFDS proposed on November 6, approval fees for new biologics would rise from KRW 8.03 million to KRW 20.71 million, and fees for data-submission drugs would go up about sixfold. This guide shows pharma and bio SMEs how to review their filing timing, budgets, fee-reduction eligibility and public comments.

    2026-11-09
    Management Consulting

    Factories With 20–49 Workers Will Need a Safety or Health Manager — Korea's First Tripartite Agreement on November 5 (About 30,000 Sites in 5 Industries Including Manufacturing, Decree Amendment in 2027, Target Start 2028), the Owner-Led Alternative and Government Payroll Support: A Preparation Guide for Small Manufacturers

    Under Korea's November 5 tripartite agreement, about 30,000 sites with 20–49 workers in manufacturing and four other industries are expected to need a qualified safety or health manager from 2028. This guide covers what is settled and what is still open, the owner-led alternative, a cost comparison, and a preparation checklist.

    2026-11-09
    Government Programs

    SMEs Can Now Enter the KRW 1,500 Trillion 'Mega Project' Supply Chain from the Design Stage — MSS Joins as a Lead Ministry, Large/Mid-Tier–SME Councils and Regional Councils Launch (Nov 6 Plan to Expand Planning-Stage Participation), and How SMEs Targeting Semiconductor, AI Data Center and Physical AI Supply Chains Should Prepare Validation, Certification and Mass-Production Qualification

    MSS has joined Korea's KRW 1,500 trillion mega projects as a lead ministry and plans to bring SMEs in from the planning stage. This guide covers how the central and regional councils will work and how to line up support programs against the validation, certification and mass-production barriers.

    2026-11-09
    Updated daily

    Let AI find government support programs in this field

    Complete a 3-minute company assessment and we will recommend programs that fit your company, each with a match score. It is free.

    Get AI-Matched Programs for Free

    Need Consulting?

    Our technology innovation consultants will propose the optimal solution for your company.