Skip to content
Back to Blog
ESG
2026-10-267 min read3

Targets Without a Baseline Year No Longer Count — EcoVadis's October 14, 2026 Methodology Update (Mandatory Baseline Years, Dual Scope 2 Reporting, Scorecard Pre-Review) and an Evidence Checklist for Korean Supplier SMEs Facing Reassessment

For EcoVadis questionnaires submitted on or after October 14, 2026, quantitative targets without a baseline year no longer earn credit. This guide covers the 2026 methodology changes, including dual Scope 2 reporting and the scorecard pre-review, plus a 90-day evidence checklist for supplier SMEs facing reassessment.

KITIM Consulting Team

Why EcoVadis Matters Now: The Supplier's "Trust Passport"

Global automotive, electronics and chemical buyers are asking more and more of their suppliers for EcoVadis ratings. Etoday (October 26, 2026) reports that the number of assessments in Korea has also grown sharply. A medal is now part of how buyers decide whether a supplier qualifies, which makes it a kind of trust passport.

One point is easy to miss. Since 2024, medals have been based on percentile rank rather than absolute scores. If other companies improve, your medal can drop even when your own score stays the same. Keeping last year's score does not mean keeping last year's medal. KITIM's earlier post on tightening ESG assessment criteria covered the overall trend. This post looks at each methodology change that actually took effect in 2026.

The 2026 Changes at a Glance

The summary below is based on the EcoVadis Help Center and consultancy summaries. Please check the details against the official sources.

  • Q2 (rolled out April–May): Seven of the ten changes came from EU regulatory requirements. Since May 7, 2026, Scope 2 has been collected as two separate metrics, location-based and market-based, in line with the GHG Protocol's dual-reporting approach.
  • Scorecard pre-review window: Before results are published, companies get two business days to review their scorecard and flag factual errors.
  • Q3: Seven changes took effect: six on October 14 and one on October 15.
  • More transparency: EcoVadis now publishes its methodology documents in a "Regulatory disclosures" section and uses Major.Minor version numbers.
  • The Key Change: Quantitative Targets Need a Baseline Year

    For questionnaires submitted on or after October 14, quantitative targets without a baseline year no longer count toward the Policy score. Targets that were already accepted stay valid until they expire. In the past, a target year and a target value were enough. Now you also have to prove the baseline year and baseline value with internal policies or reports.

    Common gaps we see at SMEs:

  • A CEO letter that says only "30% reduction by 2030"
  • A reduction target with no documented calculation of baseline-year emissions
  • Energy or waste targets with no defined denominator (for example, per unit of revenue or per unit of output)
  • Dual Scope 2 Reporting: Reuse the Data You Already Have

  • Location-based: Multiply electricity use by Korea's official grid emission factor, published by the Greenhouse Gas Inventory and Research Center. Utility bills and meter records serve as evidence.
  • Market-based: Account for contractual instruments such as RECs, green premium purchases and PPAs. Contracts and certificates serve as evidence. Each K-RE100 option is reflected differently in market-based emissions. For those differences, see KITIM's K-RE100 post.
  • The update also adds about ten standardized metrics aligned with GRI, ESRS, VSME and ISSB. You can reuse the VSME responses you gave buyers and your GHG inventory data. It is usually more efficient to make your existing figures consistent than to produce new ones.

    Sector-Specific Materiality Pilot

    Pharmaceutical manufacturing, plastics, electronics and some agricultural sectors will see pilot questions on the materiality of environmental issues. If you are in one of these sectors and answer "not material," you will need documents that support that judgment, such as materiality assessment results or a description of your process.

    A 90-Day Evidence Checklist Before Reassessment

  • Document your targets: State the baseline year, baseline value, target year, target value, scope and owner, and keep a record of board or CEO approval.
  • Calculate baseline-year emissions: Use free or low-cost routes such as public GHG inventory support programs for SMEs or the carbon-neutrality track of the Innovation Voucher. Check that year's program notice to confirm which support types are available.
  • Prepare for the pre-review: Name an owner and a backup so you don't miss the two-day window, and turn on platform notifications.
  • Manage your evidence files: Standardize file names and versions, and check that no document is missing an issue date or signature.
  • Working with KITIM on EcoVadis

    KITIM supports each step: gap analysis, updating target and policy documents, calculating baseline-year GHG emissions, and handling submission and the scorecard pre-review. Share your reassessment schedule with us and we will identify which items to fix first under the new methodology. If you are an exporting or supplier SME looking to keep or improve your EcoVadis medal, contact KITIM for a consultation.

    EcoVadisESG RatingSupply Chain ESGEmission Reduction TargetBaseline YearScope 2Korean Exporter SME

    Related Posts

    Bio

    Biologics Approval Fees Rise From KRW 8.03M to 20.71M, Data-Submission Drugs About 6x — MFDS Fee Regulation Amendment Pre-Announced Nov 6, 2026 (Comments Due Nov 26 / Dec 16): Filing Timing, Budget Review and Fee-Reduction Checks for Pharma & Bio SMEs

    Under the fee amendment MFDS proposed on November 6, approval fees for new biologics would rise from KRW 8.03 million to KRW 20.71 million, and fees for data-submission drugs would go up about sixfold. This guide shows pharma and bio SMEs how to review their filing timing, budgets, fee-reduction eligibility and public comments.

    2026-11-09
    Management Consulting

    Factories With 20–49 Workers Will Need a Safety or Health Manager — Korea's First Tripartite Agreement on November 5 (About 30,000 Sites in 5 Industries Including Manufacturing, Decree Amendment in 2027, Target Start 2028), the Owner-Led Alternative and Government Payroll Support: A Preparation Guide for Small Manufacturers

    Under Korea's November 5 tripartite agreement, about 30,000 sites with 20–49 workers in manufacturing and four other industries are expected to need a qualified safety or health manager from 2028. This guide covers what is settled and what is still open, the owner-led alternative, a cost comparison, and a preparation checklist.

    2026-11-09
    Government Programs

    SMEs Can Now Enter the KRW 1,500 Trillion 'Mega Project' Supply Chain from the Design Stage — MSS Joins as a Lead Ministry, Large/Mid-Tier–SME Councils and Regional Councils Launch (Nov 6 Plan to Expand Planning-Stage Participation), and How SMEs Targeting Semiconductor, AI Data Center and Physical AI Supply Chains Should Prepare Validation, Certification and Mass-Production Qualification

    MSS has joined Korea's KRW 1,500 trillion mega projects as a lead ministry and plans to bring SMEs in from the planning stage. This guide covers how the central and regional councils will work and how to line up support programs against the validation, certification and mass-production barriers.

    2026-11-09
    Updated daily

    Let AI find government support programs in this field

    Complete a 3-minute company assessment and we will recommend programs that fit your company, each with a match score. It is free.

    Get AI-Matched Programs for Free

    Need Consulting?

    Our technology innovation consultants will propose the optimal solution for your company.