2026 Is the First Real Year — but the Bill Arrives in 2027

The EU Carbon Border Adjustment Mechanism (CBAM) entered its definitive period in January 2026, yet settlement runs a year behind. The first annual CBAM declaration and certificate surrender for 2026 imports is due on 30 September 2027.

  • Certificate sales: start on 1 February 2027 via the common central platform. The draft delegated regulation on sale and repurchase went through public feedback in July–August 2026, with adoption planned for Q4. The draft includes a platform fee of EUR 0.05 per certificate; check the final text once it is adopted
  • Omnibus simplification: the quarterly holding requirement drops from 80% to 50%, and importers bringing in 50 tonnes or less a year are exempt
  • In the first half of 2027, EU buyers (authorised CBAM declarants) will ask Korean suppliers for verified 2026 embedded emissions
  • Actual or Default — How the Mark-Up Changes the Math

    If actual emissions are not verified, EU default values apply. For steel and aluminium, those defaults carry a mark-up of 10% in 2026, 20% in 2027 and 30% from 2028 onward (no mark-up on precursors). The Commission has committed to reviewing default values and mark-ups by the end of 2027 at the latest.

    Illustrative example (assumed figures): you export 1,000 tonnes of steel products, with a verified actual intensity of 1.8 tCO₂/t and a default value of 2.3 tCO₂/t.

  • Actual: 1,800 t → 1,800 certificates
  • Default + 10%: 2.53 tCO₂/t → 2,530 certificates
  • The gap is 730 certificates, roughly EUR 55,000 at an assumed EUR 75 price (simple calculation, before the free-allocation adjustment)
  • That gap lands on your buyer's cost sheet, so a supplier declared on defaults can end up classified as an expensive source.

    Why Verification Can Only Start in January 2027

    Annual embedded emissions cover calendar-year 2026, so they can only be verified after year-end. Verifiers have been able to register in the CBAM Registry since 1 September 2026, and the first accredited verifier was announced in late September. Verification reports can be issued in the Registry from January 2027. Demand for site visits will therefore pile into January–August. If your verification slips, your buyer may declare on default values and push that cost into price negotiations.

    2026 Data to Lock Down Now (November–December)

  • Installation boundaries, with production processes and precursors clearly separated
  • Monthly source records for fuel, electricity and raw-material inputs, plus meter calibration records
  • The basis for allocating output to each product (CN code), and supplier emissions data for purchased precursors
  • A consistency check between the figures you sent buyers for quarterly reports in the transitional period (2023–2025) and this annual figure
  • Reviewing Contracts and Communication with EU Buyers

  • Contract terms: check the scope of data you provide, who pays for verification, and any price-adjustment clause that applies if default values are used
  • Declarant status: importers that applied by 31 March 2026 can keep importing while their application is pending, but later applicants cannot import more than 50 tonnes a year until they are authorised. Confirm your buyer's status to rule out delivery disruptions
  • Origin carbon-price deduction: the implementing rules for deducting costs paid under Korea's Emissions Trading Scheme (K-ETS) are still being finalised. The deduction is expected to be based on the price effectively paid after free allocation, so start organising installation-level evidence of allowance purchases and surrenders now
  • Support Programs That Lower the Cost

    Use existing programs with verification readiness in mind: SME CBAM MRV infrastructure support, greenhouse gas inventory support, and carbon-reduction R&D for key export items. The infrastructure program can fund metering equipment and data systems, and the inventory program can strengthen your calculation method. Your verified 2026 results then become the basis for deciding which abatement investments come first.

    Action Checklist for SME Exporters

  • December: plan how you will close out 2026 installation data
  • Now: contact accredited verifiers and book your slot
  • Q1 2027: complete on-site verification
  • Q2 2027: send verified reports to your buyers
  • List each buyer's required formats and deadlines, and estimate the benefit of actual emissions over default values
  • KITIM supports the whole process: calculating embedded emissions and cleaning up data, handling verification, preparing documents for buyers, and linking you to relevant government support programs. To get ready before verification demand peaks, contact the KITIM consulting team today.

    CBAMCarbon Border Adjustment MechanismCBAM VerificationEmbedded EmissionsDefault Value Mark-UpCBAM CertificatesSteel ExportsAluminium ExportsKorean Export SMEs

    Related Posts

    Bio

    Biologics Approval Fees Rise From KRW 8.03M to 20.71M, Data-Submission Drugs About 6x — MFDS Fee Regulation Amendment Pre-Announced Nov 6, 2026 (Comments Due Nov 26 / Dec 16): Filing Timing, Budget Review and Fee-Reduction Checks for Pharma & Bio SMEs

    Under the fee amendment MFDS proposed on November 6, approval fees for new biologics would rise from KRW 8.03 million to KRW 20.71 million, and fees for data-submission drugs would go up about sixfold. This guide shows pharma and bio SMEs how to review their filing timing, budgets, fee-reduction eligibility and public comments.

    2026-11-09
    Management Consulting

    Factories With 20–49 Workers Will Need a Safety or Health Manager — Korea's First Tripartite Agreement on November 5 (About 30,000 Sites in 5 Industries Including Manufacturing, Decree Amendment in 2027, Target Start 2028), the Owner-Led Alternative and Government Payroll Support: A Preparation Guide for Small Manufacturers

    Under Korea's November 5 tripartite agreement, about 30,000 sites with 20–49 workers in manufacturing and four other industries are expected to need a qualified safety or health manager from 2028. This guide covers what is settled and what is still open, the owner-led alternative, a cost comparison, and a preparation checklist.

    2026-11-09
    Government Programs

    SMEs Can Now Enter the KRW 1,500 Trillion 'Mega Project' Supply Chain from the Design Stage — MSS Joins as a Lead Ministry, Large/Mid-Tier–SME Councils and Regional Councils Launch (Nov 6 Plan to Expand Planning-Stage Participation), and How SMEs Targeting Semiconductor, AI Data Center and Physical AI Supply Chains Should Prepare Validation, Certification and Mass-Production Qualification

    MSS has joined Korea's KRW 1,500 trillion mega projects as a lead ministry and plans to bring SMEs in from the planning stage. This guide covers how the central and regional councils will work and how to line up support programs against the validation, certification and mass-production barriers.

    2026-11-09
    Updated daily

    Let AI find government support programs in this field

    Complete a 3-minute company assessment and we will recommend programs that fit your company, each with a match score. It is free.

    Get AI-Matched Programs for Free

    Need Consulting?

    Our technology innovation consultants will propose the optimal solution for your company.