Free Facility-Level GHG Inventories for SMEs — Using the Korea Energy Agency's Industrial GHG Inventory Program (133 Sites in 2026) and Linking It to Reduction Equipment Support

In 2026 the Korea Energy Agency is building facility-level GHG inventories for 133 SME sites at no cost. This guide covers what to prepare for the site survey, how to use the results in reduction equipment funding applications, and how to get ready for the next intake.

KITIM Consulting Team

Why Facility-Level, Not Site Totals

The carbon data that prime contractors, overseas buyers, and lenders ask for is getting more granular. It used to be enough to report your site's annual emissions. Now the questions are about specific products and processes, and a site-wide total can't answer them.

A facility-level inventory breaks emissions down by source: boilers, drying ovens, air compressors, chillers, and so on. With that breakdown, you can see which equipment has the most room for reduction and decide where to invest first.

When companies calculate emissions on their own, the same mistakes come up again and again:

  • Missing sources: emergency generators, forklift fuel, and refrigerant leaks are often left out
  • No allocation basis: site-wide electricity gets split across facilities by estimate rather than by meter data
  • Mixed emission factors: factors from different years or sources are combined, so the results can't be compared over time
  • The 2026 Program: What You Get

    The Korea Energy Agency's Industrial GHG Inventory Program serves sites run by small and mid-sized companies. In 2026, 133 sites are taking part, 55 of them new this year.

  • From September, the Agency and its partner organizations carry out on-site surveys
  • Emissions are surveyed and calculated facility by facility to build the inventory
  • The inventory is then used to help companies set up their own GHG management system and find candidates for reduction equipment
  • Participating companies receive the inventory and emissions calculation free of charge
  • The program also runs industry-specific tracks, including an inventory partnership for the textile sector and a track with the Korea International Trade Association that runs from training through ESG assessment. Export-heavy companies should check these tracks first.

    What to Prepare Before the Site Survey

    How good the survey turns out depends a lot on what you have ready beforehand:

  • Energy data: three years of fuel, electricity, and steam bills, plus readings for each meter
  • Equipment data: equipment register (capacity, operating hours, fuel type), process flow diagrams, and refrigerant recharge records
  • Operating setup: a named owner for the data and a set schedule for updating it
  • The last item matters most. An inventory isn't a one-time report. It's only worth having if you can update it yourself every year after the program ends.

    Next Step: Linking to Reduction Equipment Support

    Reduction candidates identified in the inventory can support applications to follow-on programs such as high-efficiency equipment replacement, fuel switching, and carbon-neutral capital investment. With baseline emissions already established, it's easier to estimate expected reductions and to verify them afterward. That helps both at selection and at final settlement.

    The same data can be reused in several places:

  • Supply-chain carbon questionnaires from prime contractors
  • The data foundation for EU CBAM compliance and product carbon footprint (PCF) calculations
  • Transition and green finance reviews at your bank
  • The real value of the program is a build-once, use-many-times data setup.

    Roadmap for the Next Intake

    Site selection for 2026 has closed. If you missed it, watch the Korea Energy Agency's notices for the next call. Before it opens, check the following:

  • Your site's annual energy consumption
  • How many major emitting units you have and how they're metered
  • Who on your team can manage the data
  • Until you're selected, set a rough baseline from your utility bills. It won't be precise, but it will show which equipment accounts for most of your emissions, and it will make the formal site survey go much faster.

    How KITIM Can Help

    KITIM supports you from interpreting inventory results and ranking reduction investments to preparing applications for follow-on equipment programs. If you want to turn a free inventory into real reductions and government funding, contact the KITIM consulting team. We'll propose an action roadmap that fits your site.

    GHG InventoryKorea Energy AgencyEmissions CalculationSME Carbon ManagementReduction Equipment SupportScope 1 and 2Supply Chain Carbon Data

    Related Posts

    Bio

    Biologics Approval Fees Rise From KRW 8.03M to 20.71M, Data-Submission Drugs About 6x — MFDS Fee Regulation Amendment Pre-Announced Nov 6, 2026 (Comments Due Nov 26 / Dec 16): Filing Timing, Budget Review and Fee-Reduction Checks for Pharma & Bio SMEs

    Under the fee amendment MFDS proposed on November 6, approval fees for new biologics would rise from KRW 8.03 million to KRW 20.71 million, and fees for data-submission drugs would go up about sixfold. This guide shows pharma and bio SMEs how to review their filing timing, budgets, fee-reduction eligibility and public comments.

    2026-11-09
    Management Consulting

    Factories With 20–49 Workers Will Need a Safety or Health Manager — Korea's First Tripartite Agreement on November 5 (About 30,000 Sites in 5 Industries Including Manufacturing, Decree Amendment in 2027, Target Start 2028), the Owner-Led Alternative and Government Payroll Support: A Preparation Guide for Small Manufacturers

    Under Korea's November 5 tripartite agreement, about 30,000 sites with 20–49 workers in manufacturing and four other industries are expected to need a qualified safety or health manager from 2028. This guide covers what is settled and what is still open, the owner-led alternative, a cost comparison, and a preparation checklist.

    2026-11-09
    Government Programs

    SMEs Can Now Enter the KRW 1,500 Trillion 'Mega Project' Supply Chain from the Design Stage — MSS Joins as a Lead Ministry, Large/Mid-Tier–SME Councils and Regional Councils Launch (Nov 6 Plan to Expand Planning-Stage Participation), and How SMEs Targeting Semiconductor, AI Data Center and Physical AI Supply Chains Should Prepare Validation, Certification and Mass-Production Qualification

    MSS has joined Korea's KRW 1,500 trillion mega projects as a lead ministry and plans to bring SMEs in from the planning stage. This guide covers how the central and regional councils will work and how to line up support programs against the validation, certification and mass-production barriers.

    2026-11-09
    Updated daily

    Let AI find government support programs in this field

    Complete a 3-minute company assessment and we will recommend programs that fit your company, each with a match score. It is free.

    Get AI-Matched Programs for Free

    Need Consulting?

    Our technology innovation consultants will propose the optimal solution for your company.