Skip to content
Back to Blog
Smart Factory
2026-09-297 min read24

The 2027 Smart Factory Program Overhaul — Unified Policy Tracks, a November Integrated Call, and More Slots for General (428) and Manufacturing-AI (500) Types: What SMEs Should Prepare Now

Korea's 2027 smart factory program is expected to merge its policy tracks and open all main types in a single November call, with about 428 General and 500 Manufacturing-AI slots. This guide covers the new selection structure, how to choose the right type, and a three-month preparation roadmap.

KITIM Consulting Team

What's Changing in the 2027 Smart Factory Program

Korea's smart factory program is set for a major restructuring in 2027. According to briefings held by regional Technoparks (TPs), the policy-linked tracks that were split into several streams through 2026 will be merged into a single track starting in 2027. The main program types, including Government General, Manufacturing-AI, and Autonomous Factory, are expected to be announced together in November.

The support volumes mentioned at the briefings are:

  • Government General type: 265 → 428 companies
  • Manufacturing-AI type: 400 → around 500 companies
  • The first step is already underway. The call for lead implementing agencies for the 2027 program runs from September 16 to October 13, 2026, and the call for companies follows once those agencies are selected. These figures and dates come from the briefings, so check them again against the final official notice.

    Background: KRW 2.5 Trillion Over 12 Years, but Only 2% Reached Real-Time Control

    National audit materials reported on September 27, 2026 (Rep. Heo Seong-mu) show that about KRW 2.5 trillion went into the program from 2014 to 2025. Yet roughly 70% of participating companies (17,959 firms) are still at the basic level of barcodes and simple digitization. Only 525 firms (2.0%) reached the "Intermediate 2" level, where real-time decisions and control become possible.

    This is why policy is moving away from counting installations and toward advancement and practical AI deployment. Real-time defect detection, predictive maintenance, and process optimization are becoming core evaluation criteria. So the first step is to find out where your factory stands today. Only then can you choose the right program type.

    Choosing Your Type Under the Integrated Call

    General Type

    This type fits companies that don't yet have basic systems such as MES or ERP. With the quota expected to grow by more than 60%, it's a strong opportunity for firms that are building their digital foundation.

    Manufacturing-AI Type

    This type suits companies that already run an MES and collect equipment data. Selection depends on two things: whether you have clearly defined the problem you want to solve (defects, breakdowns, or yield), and whether usable data has actually been collected.

    Autonomous Factory Type

    This type is for companies with a clear goal of AI-driven autonomous control at the line level. Check early whether you can form a consortium with solution suppliers and whether you can cover your share of the cost.

    Because every type opens at the same time, the best strategy is to pick the right one and commit to it rather than spreading your effort across several. Merging the tracks may change bonus points and eligibility rules, so read the official notice closely.

    Two Months Before the November Call: What to Do Now

  • September–October: Assess your current maturity level. Review how your equipment and process data is collected, including how often it is captured and whether it is stored. Narrow the shop-floor problems you want to solve down to one or two.
  • October–November: Compare candidate solution suppliers using their capability assessment grades. Build a funding plan that covers your company's share and any matching policy loans.
  • Right after the call opens: Put numbers on your KPIs in the business plan and include baselines, such as "defect rate 3.2% → 1.5%" or "equipment uptime 72% → 85%". Include a plan for securing the staff who will run the system.
  • Common Mistakes and What Evaluators Look For

  • Treating AI adoption as the goal itself: A plan that lists solutions without a real shop-floor problem or KPIs will not convince evaluators.
  • Applying for Manufacturing-AI without data: If you are still at the basic level, starting with the General type to build your foundation improves both your chances of selection and your real results.
  • Leaving out post-project management: If the plan ignores the five-year post-project management period and possible staffing gaps, advancement often stalls after the build.
  • How KITIM Can Help

    KITIM provides step-by-step consulting that covers maturity assessment, type selection, supplier selection, business plan writing, and post-project management. For companies unsure whether the General or Manufacturing-AI type fits them better, we review your data readiness and shop-floor problems together.

    There are only about two months until the November integrated call. If you wait for the announcement to start, you won't have time to refine your KPIs or compare suppliers properly. Book a pre-assessment consultation with KITIM now, and we'll design the right program type and preparation roadmap for your company together.

    2027 Smart Factory ProgramIntegrated CallManufacturing AI Smart FactoryAutonomous FactorySmart Factory AdvancementSmart Manufacturing Innovation Support

    Related Posts

    Bio

    Biologics Approval Fees Rise From KRW 8.03M to 20.71M, Data-Submission Drugs About 6x — MFDS Fee Regulation Amendment Pre-Announced Nov 6, 2026 (Comments Due Nov 26 / Dec 16): Filing Timing, Budget Review and Fee-Reduction Checks for Pharma & Bio SMEs

    Under the fee amendment MFDS proposed on November 6, approval fees for new biologics would rise from KRW 8.03 million to KRW 20.71 million, and fees for data-submission drugs would go up about sixfold. This guide shows pharma and bio SMEs how to review their filing timing, budgets, fee-reduction eligibility and public comments.

    2026-11-09
    Management Consulting

    Factories With 20–49 Workers Will Need a Safety or Health Manager — Korea's First Tripartite Agreement on November 5 (About 30,000 Sites in 5 Industries Including Manufacturing, Decree Amendment in 2027, Target Start 2028), the Owner-Led Alternative and Government Payroll Support: A Preparation Guide for Small Manufacturers

    Under Korea's November 5 tripartite agreement, about 30,000 sites with 20–49 workers in manufacturing and four other industries are expected to need a qualified safety or health manager from 2028. This guide covers what is settled and what is still open, the owner-led alternative, a cost comparison, and a preparation checklist.

    2026-11-09
    Government Programs

    SMEs Can Now Enter the KRW 1,500 Trillion 'Mega Project' Supply Chain from the Design Stage — MSS Joins as a Lead Ministry, Large/Mid-Tier–SME Councils and Regional Councils Launch (Nov 6 Plan to Expand Planning-Stage Participation), and How SMEs Targeting Semiconductor, AI Data Center and Physical AI Supply Chains Should Prepare Validation, Certification and Mass-Production Qualification

    MSS has joined Korea's KRW 1,500 trillion mega projects as a lead ministry and plans to bring SMEs in from the planning stage. This guide covers how the central and regional councils will work and how to line up support programs against the validation, certification and mass-production barriers.

    2026-11-09
    Updated daily

    Let AI find government support programs in this field

    Complete a 3-minute company assessment and we will recommend programs that fit your company, each with a match score. It is free.

    Get AI-Matched Programs for Free

    Need Consulting?

    Our technology innovation consultants will propose the optimal solution for your company.